Навыки и умения | Oleg Novikov Address: Atyrau, Samal district, 19/43 Mobile: + 77054672294 +77785098375 E-mail: oleg9290902@gmail.com ___________________________________________________________________________________ Personal data: Date of Birth: December 16, 1985 Citizenship: Republic of Kazakhstan, Atyrau Marital Status: Married Education: Higher Specialty: Industrial civil engineering 2003-2009 Kazakh Leading Academies of Architecture and civil Engineering (KAZGASA, CBC Department) Work experience: April 2018 -June 2019 LLP "Sicim” Position: Technical Piping Supervisor (piping and valve installation) and Hydrostatic testing/Preservation for projects MS52, MS31, MS53, WP52/1, WP52/2, WP53/1, WP 53/2 (oil production and transportation) and MM in Tengiz for FGP projects • Responsible for managing the activities related to pipeline cleaning, finalization of the Hydrotest packaging accordance with TCO engineering standards and procedures. • Responsible for managing the activities related pipeline cleaning, gauging, flooding, hydro-testing, dewatering, swabbing and drying. • Coordinating with Pipe Line spread in charge, QA/QC and HSE team in the organization and those of client for related activities • Determining the MAP (Maximum Allowable Operating Pressure) and Specified Minimum Yield Strength (SMYS) and Recycle test Pressure. Manpower, equipment and material planning for cleaning, gauging, Hydro testing, Dewatering, Swabbing, Drying and leak • Monitoring installation and testing of pipelines, valves, and other piping items. Review hydro test package, carry out inspection of the lines prior to testing • Review of Calibration records for various instruments and Documentation control. • Preparation of test pack, Planning and execution of preparatory activities. • Checking hydro test equipment and instruments. • Making arrangement for sourcing and transporting of test water and disposal thereof. • Get repaired the line if any leak is attended and Re- Hydro test. • Using of specification and procedure for quality welding. • Taking action while any objection from client and consultant. • Maintaining good contact with consultant and client. • Responsible for HSE of all personnel involved in the operation. • Leading staff personnel in executing Preservation activities. • Establishing a Quality of Preservation and cleanliness regime which will provide assurance that plant and equipment will remain in good condition and operable at all stages throughout the project. • Ensuring the Quality Preservation and cleanliness regime is consistently implemented from Supplier Works through Fabrication, Installation, Commissioning, and final handover to Operations. • Implementing and Maintaining a Preservation Records System to demonstrate compliance to the pres |